(→1.2 Release) |
(→1.2 Release) |
||
| Line 24: | Line 24: | ||
| 30 September | | 30 September | ||
| | | | ||
| - | | Not-studied features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. | + | | Not-studied features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Takes 1-2 weeks after the first action. |
|- | |- | ||
| 90% Requirements Testable | | 90% Requirements Testable | ||
| Line 30: | Line 30: | ||
| 30 September | | 30 September | ||
| | | | ||
| - | | Not-testable features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. | + | | Not-testable features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Workshop required to close this case. |
|- | |- | ||
| TMS assigned | | TMS assigned | ||
| Check Item | Owner | Planned | Actual | Comment |
|---|---|---|---|---|
| Requirements Filed | Gavin Hindman | 10 September | All the 1.2 requirements must be selected with the "1.2" version. The "unspecified" and "1.2" requirements. | |
| Requirements Testability Check Completed | Tommi Toropainen | 30 September | Not-studied features can be found from here. Takes 1-2 weeks after the first action. | |
| 90% Requirements Testable | Gavin Hindman | 30 September | Not-testable features can be found from here. Workshop required to close this case. | |
| TMS assigned | Alexander Kanevekiy | 30 September | Features that are missing the TMS can be viewed here. | |
| Test Plan Approved | Tommi Toropainen | 22 September | 24 September | |
| Architecture Defined | Sakari Poussa | 30 September | 30 September |