(→Aava Summery) |
(→N900 Summery) |
||
| Line 8: | Line 8: | ||
* Pass rate of total went up from 39% (0921) to 52% (0927) | * Pass rate of total went up from 39% (0921) to 52% (0927) | ||
| - | * UI clumsy in general | + | * UI clumsy in general (VKB, not functional) |
* Browser fails. | * Browser fails. | ||
* SMS send fails | * SMS send fails | ||
| Line 14: | Line 14: | ||
* Music Player works. | * Music Player works. | ||
* Video Play works. | * Video Play works. | ||
| + | |||
| + | === Aava Summery === | ||
| + | |||
| + | * Pass rate of total went from | ||
| + | * Modem related features don't work. | ||
=== Statistics === | === Statistics === | ||
Contents |
| Check Item | Owner | Planned | Actual | Comment |
|---|---|---|---|---|
| Requirements Filed | Gavin Hindman | 10 September | 30 September | All the 1.2 requirements must be selected. The "unspecified" and "1.2" requirements. |
| Requirements Testability Check Completed | Tommi Toropainen | 30 September | 14 October | Not-studied features can be found from here. Takes 1-2 weeks after the first action. |
| 90% Requirements Testable | Gavin Hindman | 30 September | ?? | Not-testable features can be found from here. Workshop required to close this case. |
| TMS assigned | Alexander Kanevekiy | 30 September | ?? | Features that are missing the TMS can be viewed here. |
| Test Plan Approved | Tommi Toropainen | 22 September | 24 September | |
| Architecture Defined | Sakari Poussa | 30 September | 30 September |