(→Aava Summery) |
(→Aava Summery) |
||
| Line 19: | Line 19: | ||
[http://wiki.meego.com/Quality/HandsetTestReport/AavaAcceptance20100926 0926] | [http://wiki.meego.com/Quality/HandsetTestReport/AavaAcceptance20100926 0926] | ||
| - | * Pass rate of total went from | + | * Pass rate of total went from 61% (0921) to 67% (0926). |
* Modem related features don't work. | * Modem related features don't work. | ||
Contents |
| Check Item | Owner | Planned | Actual | Comment |
|---|---|---|---|---|
| Requirements Filed | Gavin Hindman | 10 September | 30 September | All the 1.2 requirements must be selected. The "unspecified" and "1.2" requirements. |
| Requirements Testability Check Completed | Tommi Toropainen | 30 September | 14 October | Not-studied features can be found from here. Takes 1-2 weeks after the first action. |
| 90% Requirements Testable | Gavin Hindman | 30 September | ?? | Not-testable features can be found from here. Workshop required to close this case. |
| TMS assigned | Alexander Kanevekiy | 30 September | ?? | Features that are missing the TMS can be viewed here. |
| Test Plan Approved | Tommi Toropainen | 22 September | 24 September | |
| Architecture Defined | Sakari Poussa | 30 September | 30 September |