Meego Wiki
Views

Core OS Program Dashboard

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(1.2 Release)
(1.2 Release)
Line 45: Line 45:
| Tommi Toropainen
| Tommi Toropainen
| 30 September
| 30 September
-
| 14 October
+
| 15 October
| Not-studied features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Takes 1-2 weeks after the "Requirements Filed".
| Not-studied features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Takes 1-2 weeks after the "Requirements Filed".
|-
|-
Line 51: Line 51:
| Gavin Hindman
| Gavin Hindman
| 30 September
| 30 September
-
| 21 October
+
| 22 October
| Not-testable features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Workshop required to close this case.
| Not-testable features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Workshop required to close this case.
|-
|-
Line 57: Line 57:
| Alexander Kanevekiy
| Alexander Kanevekiy
| 30 September
| 30 September
-
| ??
+
| 29 October
| Features that are missing the TMS can be viewed [http://bugs.meego.com/report.cgi?x_axis_field=bug_status&y_axis_field=assigned_to&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&target_milestone=---&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here].
| Features that are missing the TMS can be viewed [http://bugs.meego.com/report.cgi?x_axis_field=bug_status&y_axis_field=assigned_to&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&target_milestone=---&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here].
|-
|-

Revision as of 08:54, 28 September 2010

Contents

1.1 Release

Test Results

N900 Summery

0927

  • Pass rate of total went up from 39% (0921) to 52% (0927)
  • UI clumsy in general (VKB, not functional)
  • Browser fails.
  • SMS send fails
  • Phone Call works.
  • Music Player works.
  • Video Play works.

Aava Summery

0926

  • Pass rate of total went from 61% (0921) to 67% (0926).
  • Modem related features don't work.

Statistics

1.2 Release

Check Item Owner Planned Actual Comment
Requirements Filed Gavin Hindman 10 September 30 September All the 1.2 requirements must be selected. The "unspecified" and "1.2" requirements.
Requirements Testability Check Completed Tommi Toropainen 30 September 15 October Not-studied features can be found from here. Takes 1-2 weeks after the "Requirements Filed".
90% Requirements Testable Gavin Hindman 30 September 22 October Not-testable features can be found from here. Workshop required to close this case.
TMS assigned Alexander Kanevekiy 30 September 29 October Features that are missing the TMS can be viewed here.
Test Plan Approved Tommi Toropainen 22 September 1 October The Core OS Program test plan is under review.
Architecture Defined Sakari Poussa 30 September 30 September
Personal tools