Meego Wiki
Views

Core OS Program Dashboard

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(1.2 Release)
m (1.1 Release)
 
(5 intermediate revisions not shown)
Line 1: Line 1:
== 1.1 Release ==
== 1.1 Release ==
-
[http://wiki.meego.com/Quality/HandsetTestReport#Acceptance_Test_Results_.28Trunk:_Testing.29 Test Results]
+
[http://qa-reports.meego.com/1.1 Test Results]
-
=== N900 Summery ===
+
=== N900 Summary ===
-
 
+
-
[http://wiki.meego.com/Quality/HandsetTestReport/N900Acceptance20100927 0927]
+
* Pass rate of total went up from 39% (0921) to 52% (0927)
* Pass rate of total went up from 39% (0921) to 52% (0927)
Line 15: Line 13:
* Video Play works.
* Video Play works.
-
=== Aava Summery ===
+
=== Aava Summary ===
-
 
+
-
[http://wiki.meego.com/Quality/HandsetTestReport/AavaAcceptance20100926 0926]
+
* Pass rate of total went from 61% (0921) to 67% (0926).
* Pass rate of total went from 61% (0921) to 67% (0926).
Line 28: Line 24:
== 1.2 Release ==
== 1.2 Release ==
 +
 +
=== Planning Milestone ===
{| cellpadding="5" cellspacing="0" border="1"
{| cellpadding="5" cellspacing="0" border="1"
Line 45: Line 43:
| Tommi Toropainen
| Tommi Toropainen
| 30 September
| 30 September
-
| 14 October
+
| 15 October
| Not-studied features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Takes 1-2 weeks after the "Requirements Filed".
| Not-studied features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Takes 1-2 weeks after the "Requirements Filed".
|-
|-
Line 51: Line 49:
| Gavin Hindman
| Gavin Hindman
| 30 September
| 30 September
-
| ??
+
| 22 October
| Not-testable features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Workshop required to close this case.
| Not-testable features can be found from [http://bugs.meego.com/report.cgi?x_axis_field=&y_axis_field=cf_testability&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here]. Workshop required to close this case.
|-
|-
Line 57: Line 55:
| Alexander Kanevekiy
| Alexander Kanevekiy
| 30 September
| 30 September
-
| ??
+
| 29 October
| Features that are missing the TMS can be viewed [http://bugs.meego.com/report.cgi?x_axis_field=bug_status&y_axis_field=assigned_to&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&target_milestone=---&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here].
| Features that are missing the TMS can be viewed [http://bugs.meego.com/report.cgi?x_axis_field=bug_status&y_axis_field=assigned_to&z_axis_field=version&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=MeeGo+Features&product=MeeGo+Core+OS+Features&target_milestone=---&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&deadlinefrom=&deadlineto=&emailassigned_to1=1&emailtype1=substring&email1=&emailassigned_to2=1&emailreporter2=1&emailqa_contact2=1&emailcc2=1&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= here].
|-
|-
Line 64: Line 62:
| 22 September
| 22 September
| 1 October
| 1 October
-
| [http://wiki.meego.com/Quality/TestPlan/MeeGo_Core_Test_Plan The Core OS Program test plan] is under review.
+
| [[Quality/TestPlan/MeeGo Core Test Plan|The Core OS Program test plan]] is under review.
|-
|-
| Architecture Defined
| Architecture Defined

Latest revision as of 13:59, 24 March 2011

Contents

1.1 Release

Test Results

N900 Summary

  • Pass rate of total went up from 39% (0921) to 52% (0927)
  • UI clumsy in general (VKB, not functional)
  • Browser fails.
  • SMS send fails
  • Phone Call works.
  • Music Player works.
  • Video Play works.

Aava Summary

  • Pass rate of total went from 61% (0921) to 67% (0926).
  • Modem related features don't work.

Statistics

1.2 Release

Planning Milestone

Check Item Owner Planned Actual Comment
Requirements Filed Gavin Hindman 10 September 30 September All the 1.2 requirements must be selected. The "unspecified" and "1.2" requirements.
Requirements Testability Check Completed Tommi Toropainen 30 September 15 October Not-studied features can be found from here. Takes 1-2 weeks after the "Requirements Filed".
90% Requirements Testable Gavin Hindman 30 September 22 October Not-testable features can be found from here. Workshop required to close this case.
TMS assigned Alexander Kanevekiy 30 September 29 October Features that are missing the TMS can be viewed here.
Test Plan Approved Tommi Toropainen 22 September 1 October The Core OS Program test plan is under review.
Architecture Defined Sakari Poussa 30 September 30 September
Personal tools