m (→2. Community status) |
m (→2. Community status) |
||
| Line 28: | Line 28: | ||
* building the skeleton for the portal has begun 5th Dec and we are waiting for the graphics (such as logo, refined overall layout, icons, etc.) | * building the skeleton for the portal has begun 5th Dec and we are waiting for the graphics (such as logo, refined overall layout, icons, etc.) | ||
* http://summit.meegonetwork.fi/ will be the main page for the MeeGo Summit FI 2011. | * http://summit.meegonetwork.fi/ will be the main page for the MeeGo Summit FI 2011. | ||
| - | * http://meegonetwork.fi/ will be the main page for the community portal. | + | * http://meegonetwork.fi/ will be the main page for the community portal, which will include such services as: |
| + | ** login with 3rd party credentials | ||
| + | ** Blog aggregation or build-in blogging feature. | ||
| + | ** Event calendar | ||
| + | ** Communication (information about our communication tools) | ||
| + | ** Separate section for annual Regional Summits | ||
| + | ** Material bank/Media (material used/presented in local network meetings, etc.) | ||
| + | ** Discussion Forum | ||
| + | ** Basic information about local Networks in Finland | ||
| + | ** Press (section for Press related items such as logos and announcements) | ||
| + | |||
* For the graphics, two graphical designers has been assigned (outside the community) | * For the graphics, two graphical designers has been assigned (outside the community) | ||
Contents |
Add items to be discussed and be prepared to present the issue too. Issues given 24 hours before meeting are postponed to next meeting.
Check options from here
Current status of the community (kyb3R presenting)
Local Meego Networks
Community portal
Members
Marketing
Current status of the Summit (kyb3R? presenting)