(Difference between revisions)
|
|
| Line 54: |
Line 54: |
| | * Security NFRs (Gavin) | | * Security NFRs (Gavin) |
| | * Security enforcement point FEAs (Jukka) | | * Security enforcement point FEAs (Jukka) |
| - | * [http://bugs.meego.com/buglist.cgi?short_desc=[CR]&classification=MeeGo%20Features&query_format=advanced&version=1.2&short_desc_type=allwordssubstr | CR items in FZ] | + | * ["http://bugs.meego.com/buglist.cgi?short_desc=[CR]&classification=MeeGo%20Features&query_format=advanced&version=1.2&short_desc_type=allwordssubstr" CR items in FZ] |
| | * add new topics here | | * add new topics here |
| | | | |
Revision as of 17:43, 14 January 2011
MeeGo Product Management
This page is for MeeGo Product Management topics, and is work-in-progress. Contribution is highly welcome, please send email to meego-pm mail list to discuss.
Team
Communication
- Team uses the meego-pm mailing list for communication.
Process
- Product management team meets once a week in general. Currently the meetings are not public.
- Agenda and action items will be posted to the mailing list.
- Anyone can propose topics to the Product management team agenda (see below).
- Product management topics can and should be discussed on meego-pm mailing list.
- Product management team is responsible of making the decision in case consensus is not reached.
Process Improvement Topics
- How to make the meetings open. Not all the topics can be open but most can be. Examples of non-open parts includes topics which involves IPR, legal, patent, business, product or schedule sensitive material
- Address the missing visibility on roadmapping.
- Please propose and discuss new topics in the email list.
Documentation
- MeeGo roadmaps
- TODO: Some ready queries from featurezilla, like this.
- Also add tables pulled directly from featurezilla?
Meetings
- Calls happen every Wednesday 8AM PST / 6PM EET
- Agenda consists of MeeGo (1.2) Change management topics that are open (see below), and any other issues highlighted.
Active topics
- active items shall be added here for processing (labels: DROP, ADD, MODIFY, STUDY)
- items shall be tracked with states (NEW, ..)
- TODO: nice table editing system (missing TableEdit extension)
MeeGo 1.2 change management topics
New topics
- Security NFRs (Gavin)
- Security enforcement point FEAs (Jukka)
- ["http://bugs.meego.com/buglist.cgi?short_desc=[CR]&classification=MeeGo%20Features&query_format=advanced&version=1.2&short_desc_type=allwordssubstr" CR items in FZ]
- add new topics here
Active topics (still to be closed)
- DROP/CLARIFY: Package management features (Core 1.2, Core unspecified, Handset 1.2)
- Need to get feedback from dev team on the UI parts
- and assess the ones now in unspecified
- target to close next week
- MODIFY/CLARIFY: Clarification of tethering use cases (WLAN, USB, BT DUN, BT PAN)
- Gavin will discuss with dev team
- Target to close next week (possibly add WLAN and BT DUN into 1.3)
- MODIFY/CLARIFY: USB sync (MTP) (link)
- MeeGo is missing USB daemon and kernel modules to have a working solution (buteo is OK)
- target to close next week
- ADD/REVIEW: Non-functional requirements: performance (link)
- Need to be reviewed with QA team
- Discuss feedback in FZ next week, and target to close
Closed topics
- ADD: CRDA - WLAN Regulatory domain (link)
- Gavin checks from dev team -> add to 1.2 (done)
- DROP: BT LE - Proximity tracking (link)
- DROP: NTP support by Timed (link)
- No need to drop now, they will pop up again after code complete if in risk
Other active topics
- STUDY: LTE (MeeGo 1.3)
- STUDY: IPv6 clarification