(→From devel: to :Testing) |
(→Iteration cycle schedule) |
||
| Line 19: | Line 19: | ||
| - | === | + | === Additional Resources === |
something else | something else | ||
Contents |
This a checklist for developer's submitting their code to MeeGo via OBS http://build.meego.com
Following this checklist will ensure smooth submission and acceptance of code.
It is a summary of the following detailed resources:
something
something
something else