Meego Wiki
Views

SDK/Meetings/1st SDK Team F2F Workshop

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(Who)
(Agenda)
Line 27: Line 27:
* 1.2 planning (Ville/Veli)
* 1.2 planning (Ville/Veli)
** Content / architecture proposal
** Content / architecture proposal
-
*** Let's NOT go through the actual requirements-set in this meeting
+
*** High-level vision
-
*** New SDK framework (MADDE evolution plans)
+
*** Key use cases
 +
**** Let's NOT go through the actual requirements-set in this meeting
 +
*** New SDK engine (MADDE evolution plans)
*** Builds for multiple targets
*** Builds for multiple targets
** Specific topics
** Specific topics
-
*** Creating a release check list (Titta)
+
*** Hard-fp support for ARM
*** Installing & Updating the SDK
*** Installing & Updating the SDK
*** How does a device vendor get to be part of the SDK?
*** How does a device vendor get to be part of the SDK?
Line 42: Line 44:
* GTM activities (Ville)
* GTM activities (Ville)
** Release checklist with owner, approver(s) and schedules for each deliverable
** Release checklist with owner, approver(s) and schedules for each deliverable
 +
** Creating a release check list (Titta)
** Plan for 1.2
** Plan for 1.2

Revision as of 09:48, 12 November 2010

Contents

1st MeeGo SDK Team Face-to-Face Workshop

When

Wednesday 17.11.2010, the whole day.

Start early, finish by 1600 (vacate the stadium for the game and for the 1845 flight out).

Where

TODO: Can we book a meeting room etc?

Who

  • Nokia: Veli Kaksonen, Ville Lavonius, Fathi Boudra, Maurice Kalinowski, Jaya Uppalapati, Titta Väyrynen, Nishant Tandon, Kamal Bhatt, Ronan MacLaverty (?), Janne Sormunen (if needed).
  • Intel: Bob Spencer, Kerry Jiang, Haitao Feng, Zhiyuan Lv, Jackie Wu (phone), Cathy Shen (phone), Elliot Smith (?), Dawn Foster (?),

Agenda

Items we could discuss about, name in parenthesis is just the person who proposes an item, not an act of volunteering to run that show.

  • 1.1 post-mortem (Ville)
    • What went well
    • What didn't go well
    • Lessons learned
  • 1.2 planning (Ville/Veli)
    • Content / architecture proposal
      • High-level vision
      • Key use cases
        • Let's NOT go through the actual requirements-set in this meeting
      • New SDK engine (MADDE evolution plans)
      • Builds for multiple targets
    • Specific topics
      • Hard-fp support for ARM
      • Installing & Updating the SDK
      • How does a device vendor get to be part of the SDK?
      • QEMU Skin support
      • Device Control Framework (Veli)
        • GPS, accelerometer, camera, phone SIM
        • GUI for controlling. (e.g. What do we provide for setting the GPS location etc?)
    • Next steps for 1.2
  • GTM activities (Ville)
    • Release checklist with owner, approver(s) and schedules for each deliverable
    • Creating a release check list (Titta)
    • Plan for 1.2
  • Strategic directions (Ville)
    • Requirements beyond 1.2
    • Eclipse-support
    • Commercial tools (VTune, ...)
    • Channel plans (OVI, AppUp, ...)
  • RPM support (Fathi)
    • rrpmbuild features (generate rpm package)
    • missing features (missing provides/requires)
    • app store expectations
  • Next face-to-face meeting logistics
    • January 2011?
    • Somewhere accessible by a single flight for all participants
Personal tools