Meego Wiki
Views

SDK/Meetings/1st SDK Team F2F Workshop

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(Added times)
Line 3: Line 3:
== When ==
== When ==
-
Wednesday 17.11.2010, the whole day.
+
Wednesday 17.11.2010, the whole day. '''From 9:00 to 16:00'''.
Start early, finish by 1600 (vacate the stadium for the game and for the 1845 flight out).
Start early, finish by 1600 (vacate the stadium for the game and for the 1845 flight out).
Line 9: Line 9:
== Where ==
== Where ==
-
TODO: Can we book a meeting room etc?
+
Bob has a room for us!
== Who ==
== Who ==
-
* Nokia: Veli Kaksonen, Ville Lavonius, Fathi Boudra, Maurice Kalinowski, Jaya Uppalapati, Titta Väyrynen, Nishant Tandon, Kamal Bhatt, Ronan MacLaverty (?), Janne Sormunen (if needed).  
+
* Nokia: Veli Kaksonen, Ville Lavonius, Fathi Boudra, Maurice Kalinowski, Jaya Uppalapati, Titta Väyrynen, Kamal Bhatt, Ronan MacLaverty (?), Janne Sormunen (if needed).  
* Intel: Bob Spencer, Kerry Jiang, Haitao Feng, Zhiyuan Lv, Jackie Wu (phone), Cathy Shen (phone), Elliot Smith (?), Dawn Foster (?),
* Intel: Bob Spencer, Kerry Jiang, Haitao Feng, Zhiyuan Lv, Jackie Wu (phone), Cathy Shen (phone), Elliot Smith (?), Dawn Foster (?),
== Agenda ==
== Agenda ==
-
Items we could discuss about, name in parenthesis is just the person who proposes an item, not an act of volunteering to run that show.
+
Name in parenthesis is just the person who proposes an item, not an act of volunteering to run that show.
-
* SDK program setup
 
-
** Subteams
 
-
*** Current
 
-
*** Needed
 
-
*** Team lead prospects
 
-
** Other responsibilities
 
 +
=== 9:00 - 9:30 ::: 1.1 post-mortem (Ville) ===
-
* 1.1 post-mortem (Ville)
+
* What went well
-
** What went well
+
* What didn't go well
-
** What didn't go well
+
* Lessons learned
-
** Lessons learned
+
-
* 1.2 planning (Ville/Veli)
 
-
** Content / architecture proposal
 
-
*** High-level vision
 
-
*** Key use cases
 
-
**** Let's NOT go through the actual requirements-set in this meeting
 
-
*** New SDK engine (MADDE evolution plans)
 
-
*** Builds for multiple targets
 
-
** Specific topics
 
-
*** Hard-fp support for ARM
 
-
*** Installing & Updating the SDK
 
-
*** How does a device vendor get to be part of the SDK?
 
-
*** QEMU Skin support
 
-
*** Device Control Framework  (Veli)
 
-
**** GPS, accelerometer, camera, phone SIM 
 
-
**** GUI for controlling.  (e.g. What do we provide for setting the GPS location etc?)
 
-
** Next steps for 1.2
 
-
* GTM activities (Ville)
+
=== 9:30 - 11:00 ::: 1.2 planning (Ville/Veli)
-
** Release checklist with owner, approver(s) and schedules for each deliverable
+
-
** Creating a release check list (Titta)
+
-
** Plan for 1.2
+
-
* Strategic directions (Ville)
+
* Content / architecture proposal
-
** Requirements beyond 1.2
+
** High-level vision
-
** Eclipse-support
+
** Key use cases
-
** Commercial tools (VTune, ...)
+
*** Let's NOT go through the actual requirements-set in this meeting
-
** Channel plans (OVI, AppUp, ...)
+
** New SDK engine (MADDE evolution plans)
 +
** Builds for multiple targets
 +
* Specific topics
 +
** Hard-fp support for ARM
 +
** Installing & Updating the SDK
 +
** How does a device vendor get to be part of the SDK?
 +
** QEMU Skin support
 +
** Device Control Framework  (Veli)
 +
*** GPS, accelerometer, camera, phone SIM 
 +
*** GUI for controlling. (e.g. What do we provide for setting the GPS location etc?)
 +
* Next steps for 1.2
-
* Release Management with Distro Team F2F
 
-
** 1hr discussion about SDK needs, QEMU builds, etc.
 
-
* RPM support (Fathi)
+
=== 11:00 - 12:00 ::: Release Management with Distro Team F2F ===
-
** rrpmbuild features (generate rpm package)
+
-
** missing features (missing provides/requires)
+
-
** app store expectations
+
-
* Next face-to-face meeting logistics
+
* Any open issues with the SDK and distro release process
-
** January 2011?
+
* How to handle new potential verticals in 2011 (Tablet, TV, IVI, etc.)
-
** Somewhere accessible by a single flight for all participants
+
* QEMU image.  Building with each vertical build
 +
 
 +
 
 +
=== 12:00 - 12:45 ::: SDK program setup ===
 +
 
 +
* Subteams
 +
** Current
 +
** Needed
 +
** Team lead prospects
 +
* Other responsibilities
 +
 
 +
 
 +
=== 12:45 - 13:30 ::: Luch ===
 +
 
 +
* Some eating!
 +
 
 +
 
 +
=== 13:30 - 14:30 ::: GTM activities (Ville) ===
 +
 
 +
* Release checklist with owner, approver(s) and schedules for each deliverable
 +
* Creating a release check list (Titta)
 +
* Plan for 1.2
 +
 
 +
 
 +
=== 14:30 - 15:00 ::: Strategic directions (Ville) ===
 +
 
 +
* Requirements beyond 1.2
 +
* Eclipse-support
 +
* Commercial tools (VTune, ...)
 +
* Channel plans (OVI, AppUp, ...)
 +
 
 +
 
 +
=== 15:00 - 15:30 ::: RPM support (Fathi) ===
 +
 
 +
* rrpmbuild features (generate rpm package)
 +
* missing features (missing provides/requires)
 +
* app store expectations
 +
 
 +
 
 +
=== 15:30 - 16:00 ::: Next face-to-face meeting logistics ===
 +
 
 +
* January 2011?
 +
* Somewhere accessible by a single flight for all participants
 +
** Paris?

Revision as of 13:34, 16 November 2010

Contents

1st MeeGo SDK Team Face-to-Face Workshop

When

Wednesday 17.11.2010, the whole day. From 9:00 to 16:00.

Start early, finish by 1600 (vacate the stadium for the game and for the 1845 flight out).

Where

Bob has a room for us!

Who

  • Nokia: Veli Kaksonen, Ville Lavonius, Fathi Boudra, Maurice Kalinowski, Jaya Uppalapati, Titta Väyrynen, Kamal Bhatt, Ronan MacLaverty (?), Janne Sormunen (if needed).
  • Intel: Bob Spencer, Kerry Jiang, Haitao Feng, Zhiyuan Lv, Jackie Wu (phone), Cathy Shen (phone), Elliot Smith (?), Dawn Foster (?),

Agenda

Name in parenthesis is just the person who proposes an item, not an act of volunteering to run that show.


9:00 - 9:30 ::: 1.1 post-mortem (Ville)

  • What went well
  • What didn't go well
  • Lessons learned


=== 9:30 - 11:00 ::: 1.2 planning (Ville/Veli)

  • Content / architecture proposal
    • High-level vision
    • Key use cases
      • Let's NOT go through the actual requirements-set in this meeting
    • New SDK engine (MADDE evolution plans)
    • Builds for multiple targets
  • Specific topics
    • Hard-fp support for ARM
    • Installing & Updating the SDK
    • How does a device vendor get to be part of the SDK?
    • QEMU Skin support
    • Device Control Framework (Veli)
      • GPS, accelerometer, camera, phone SIM
      • GUI for controlling. (e.g. What do we provide for setting the GPS location etc?)
  • Next steps for 1.2


11:00 - 12:00 ::: Release Management with Distro Team F2F

  • Any open issues with the SDK and distro release process
  • How to handle new potential verticals in 2011 (Tablet, TV, IVI, etc.)
  • QEMU image. Building with each vertical build


12:00 - 12:45 ::: SDK program setup

  • Subteams
    • Current
    • Needed
    • Team lead prospects
  • Other responsibilities


12:45 - 13:30 ::: Luch

  • Some eating!


13:30 - 14:30 ::: GTM activities (Ville)

  • Release checklist with owner, approver(s) and schedules for each deliverable
  • Creating a release check list (Titta)
  • Plan for 1.2


14:30 - 15:00 ::: Strategic directions (Ville)

  • Requirements beyond 1.2
  • Eclipse-support
  • Commercial tools (VTune, ...)
  • Channel plans (OVI, AppUp, ...)


15:00 - 15:30 ::: RPM support (Fathi)

  • rrpmbuild features (generate rpm package)
  • missing features (missing provides/requires)
  • app store expectations


15:30 - 16:00 ::: Next face-to-face meeting logistics

  • January 2011?
  • Somewhere accessible by a single flight for all participants
    • Paris?
Personal tools