Meego Wiki
Views

SDK/Meetings/20110316 Weekly

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(QA (Juha))
(Documentation (Taru))
Line 116: Line 116:
* Taru Laine is the doc team lead.
* Taru Laine is the doc team lead.
-
* Weekly documentation telco meetings were restarted on March 3. The meeting minutes are here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110303#Agenda
+
* Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110317#Agenda
* Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
* Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
** Netbook related tasks have been assigned to Elliot Smith, Bob Spencer is clarifying the resources available for the other tasks that do not have owners at the moment.
** Netbook related tasks have been assigned to Elliot Smith, Bob Spencer is clarifying the resources available for the other tasks that do not have owners at the moment.

Revision as of 12:21, 16 March 2011

Contents

MeeGo SDK Weekly Meeting 20110316

This document contains agenda and minutes (added after the meeting) of SDK weekly telco meeting on 20110316 07:30 EEST.

Conventions of this document

  • AP: = Action point agreed on this meeting
  • yyyymmdd AP: = Action point agreed on previous meeting
  • yyyymmdd AP yyymmdd: = Action point agreed on previous meeting with a deadline
  • yyyymmdd AP DONE: = Action point done
  • yyyymmdd AP CANCELLED: = Action point cancelled
  • AGREE: = Item that has been agreed by the team
  • POSTPONED: = Agenda item postponed from last meeting
  • OLD: = Info from previous meeting (delete during the meeting)

Attendees


Agenda

SDK Program (Veli)

  • Nokia changes...
  • Moving the weekly
    • AP: write email thread about moving the weekly


Features (Ville)

Architecture (Bob)

(Meetings held weekly, as needed)

Topics for future meetings:

Covered in past weeks (Resolutions here: http://piratepad.net/qqICWdiYLl )


Releasing (Fathi)

  • hardfp toolchain into MeeGo Trunk
    • SDK toolchain to update/promote
    • AP: ks files to update - new images (Fathi)
  • Toolchain broken on Fedora 14 ARM fixed, IA32 broken
  • AP: Qt 4.7.2, Qt Creator 2.1.0 released - to be integrated on week 9
  • OLD - Random images broken regularly
    • On week 8: meego-handset-ia32-qemu, meego-netbook-ia32-qemu (Jackie)
    • On week 9: meego-handset-ia32-qemu, meego-netbook-ia32-qemu (Jackie) Fixed in BOSS.
    • On week 10: fixed - issues resolved
  • qemu-arm and qemu-gl merge in progress
    • gles-libs update - IA32 GL ES support
  • AP: Qt Simulator to review and promote (Fathi)
  • OLD - Integrated meego-sdk-update-target and meego-sdk-checkversion into package meego-sdk-utils.


Windows port (Max)

  • MeeGo 1.2 SDK Preview 4 with shrunken Qt Simulator, latest Qt Creator and MADDE has been tested by QA.
    • Windows SDK will be released to QA every two weeks if there are enough new changes. It will take 1+ weeks for QA (1 person) to test it.
  • IFW source code has been built for Windows.
    • A minor gap has been found - license page contains Qt SDK
  • server available at OSU. Al has started to set up it.
    • A suid issue on the frontend build server - Max will follow this issue
    • Windows machine availability issue - We'll try virtual system for Windows first


Mac OS X port (David)

  • David Lawlor started in Portland, OR (Intel) on Jan 31st.
  • Mac server available at OSU
    • MacOS machine availability issue
  • ARM toolchain available
  • Beta desired for MeeGo 1.2 (release in May).
  • Intel guess at release is July. But scoping work is just starting.


Toolchains (JuhaK / Jarmo)

  • Toolchain meetings biweekly (http://wiki.meego.com/SDK/Toolchains/Meetings#MeeGo_Toolchain_Project_Meetings)
  • Had a telco with Linaro, meeting minutes can be found from the link above
    • discussed about toolchain selection for MeeGo 1.3 and Linaro's plans
    • gcc 4.5.2 or 4.5.3 if it comes out in time
  • We'll need to come up with a timeline proposal for MeeGo 1.3 toolchain selection
  • Intel guys are running performance/regression tests with gcc 4.5.2
  • armv8el scheduler is up and running
  • AP: set up a wiki page in meego.com for following the performance/regression testing of toolchain

Documentation (Taru)

  • Taru Laine is the doc team lead.
  • Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110317#Agenda
  • Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
    • Netbook related tasks have been assigned to Elliot Smith, Bob Spencer is clarifying the resources available for the other tasks that do not have owners at the moment.
  • In the documentation publishing process description the following section was added to describe the relationship between developer.meego.com and http://wiki.meego.com: Publishing wiki content
  • Unresolved issues to discuss with the SDK team:
    • Documentation team members for this week's meeting.
    • New feature hierarchy and its impacts on documentation
    • Community contribution for MeeGo 1.2 documentation, especially for Instructions and best practices and Sample applications.
    • Finding owners for the following tasks: Debugging instructions for MeeGo 1.2 SDK (currently part of Other documentations feature), Creating a Hello world application (currently part of Other documentations feature), Instructions for building MeeGo image/QEMU image (currently part of Other documentations feature)
    • Timetable for MeeGo 1.2 SDK developer documentation features (based on the milestones assigned for the MeeGo 1.2 SDK features)

QA (Juha)

Personal tools