Meego Wiki
Views

SDK/Meetings/20110323 Weekly

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(Agenda)
(Documentation (Taru))
Line 100: Line 100:
* Taru Laine is the doc team lead.
* Taru Laine is the doc team lead.
-
* Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110317#Agenda
+
* Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110324#Agenda
* Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
* Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
-
** Netbook related tasks have been assigned to Elliot Smith, Bob Spencer is clarifying the resources available for the other tasks that do not have owners at the moment.
+
** Bob Spencer is clarifying the resources available for tasks that do not have owners at the moment.
-
* In the [http://wiki.meego.com/SDK/Documentation documentation publishing process description] the following section was added to describe the relationship between developer.meego.com and http://wiki.meego.com: [http://wiki.meego.com/SDK/Documentation#Publishing_wiki_content Publishing wiki content]
+
* Open questions regarding DMC publishing site:  
-
* Unresolved issues to discuss with the SDK team:
+
** What type of documentation should be published through DMC and updated according to release lifecycle?
-
** New feature hierarchy and its impacts on documentation
+
** What type of documentation should be kept in Wiki for continuous updates?
-
** Finding owners for the following tasks: Debugging instructions for MeeGo 1.2 SDK (currently part of Other documentations feature), Creating a Hello world application (currently part of Other documentations feature), Instructions for building MeeGo image/QEMU image (currently part of Other documentations feature)
+
** Who will take up the main role of developing the site and coordinating the process of content creation/transfer on DMC site?
-
** Timetable for MeeGo 1.2 SDK developer documentation features (based on the milestones assigned for the MeeGo 1.2 SDK features)
+
* SDK feature status and its impacts on documentation (e.g. devices supported by MeeGo 1.2 SDK)
-
 
+
=== QA (Juha) ===
=== QA (Juha) ===

Revision as of 12:43, 23 March 2011

Contents

MeeGo SDK Weekly Meeting 20110323

This document contains agenda and minutes (added after the meeting) of SDK weekly telco meeting on 20110323 14:00 GMT.

Conventions of this document

  • AP: = Action point agreed on this meeting
  • yyyymmdd AP: = Action point agreed on previous meeting
  • yyyymmdd AP yyymmdd: = Action point agreed on previous meeting with a deadline
  • yyyymmdd AP DONE: = Action point done
  • yyyymmdd AP CANCELLED: = Action point cancelled
  • AGREE: = Item that has been agreed by the team
  • POSTPONED: = Agenda item postponed from last meeting
  • OLD: = Info from previous meeting (delete during the meeting)

Attendees

Agenda

SDK Program (Veli)

  • Nokia changes...
  • Moving the weekly


Features (Ville)

Architecture (Bob)

(Meetings held weekly, as needed)

Topics for future meetings:

Covered in past weeks (Resolutions here: http://piratepad.net/qqICWdiYLl )


Releasing (Fathi)

  • hardfp toolchain into MeeGo Trunk
    • SDK toolchain to update/promote
    • AP: ks files to update - new images (Fathi)
    • AP: update madde configuration for ARM toolchain (Fathi)
  • OLD - Toolchain broken on Fedora 14 ARM fixed, IA32 broken. FIXED by upgrading binutils, to be submitted to Tools:SDK:Host
    • Full toolchain upgrade to 1.2 is on the way. Pending windows toolchain integrated.(Windows SDK is using 1.1 toolchains)
  • AP: Qt 4.7.2, Qt Creator 2.1.0 released - to be integrated on week 9
    • Qt Creator 2.1.0 is available into devel:tools:sdk:host (week11)
    • Qt 4.7.2 fails to build on rpm based distro 32 bits
  • AP: Qt Simulator to review and promote (Fathi)


Windows port (Max)

  • Max was not present
  • Still using 1.1 toolchains
  • AP: Upgrade to 1.2 toolchains Wenchao and Max on that.
    • AP: ARM hardfp toolchain should be provided by Al
  • AP: Update to latest Qt/Qt Creator


Mac OS X port (David)

  • David was not present


Toolchains (JuhaK)

  • Toolchain meetings biweekly (http://wiki.meego.com/SDK/Toolchains/Meetings#MeeGo_Toolchain_Project_Meetings)
  • AP: set up a wiki page in meego.com for following the performance/regression testing of toolchain
    • This AP is pending because I haven't had time to do it. Target: next week
  • Junfeng Dong has joined Intel's toolchain team
  • glibc 2.12 or newer cannot be built with arm and this needs to be solved. It could require a reconfiguration of the toolchain a bit, but I'll have to figure it out. The problem is with linking some ssp (stack smashing protection) parts of the code.


Documentation (Taru)

  • Taru Laine is the doc team lead.
  • Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110324#Agenda
  • Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
    • Bob Spencer is clarifying the resources available for tasks that do not have owners at the moment.
  • Open questions regarding DMC publishing site:
    • What type of documentation should be published through DMC and updated according to release lifecycle?
    • What type of documentation should be kept in Wiki for continuous updates?
    • Who will take up the main role of developing the site and coordinating the process of content creation/transfer on DMC site?
  • SDK feature status and its impacts on documentation (e.g. devices supported by MeeGo 1.2 SDK)

QA (Juha)

Personal tools