Meego Wiki
Views

SDK/Meetings/20110330 Weekly

From MeeGo wiki
< SDK | Meetings(Difference between revisions)
Jump to: navigation, search
(Documentation (Taru))
(Minutes)
 
Line 7: Line 7:
* AP: = Action point agreed on this meeting
* AP: = Action point agreed on this meeting
* yyyymmdd AP: = Action point agreed on previous meeting
* yyyymmdd AP: = Action point agreed on previous meeting
 +
* yyyymmdd AP yyymmdd: = Action point agreed on previous meeting with a deadline
* yyyymmdd AP yyymmdd: = Action point agreed on previous meeting with a deadline
* yyyymmdd AP DONE: = Action point done
* yyyymmdd AP DONE: = Action point done
Line 16: Line 17:
== Attendees ==
== Attendees ==
-
*  
+
* Veli Kaksonen, Juha Peisanen, Ville Lavonius, Taru Laine, Max Yu, Azadeh Karimian,Viorel Mirea, Bob Spencer, Ionut Gavaz, Fathi Boudra
Line 46: Line 47:
* Windows builds  (server - http://bugs.meego.com/show_bug.cgi?id=11762, process)
* Windows builds  (server - http://bugs.meego.com/show_bug.cgi?id=11762, process)
* How to identify the installed MeeGo SDK version (registry key, file, gconf)
* How to identify the installed MeeGo SDK version (registry key, file, gconf)
 +
 +
* March 30th Meeting
 +
** Maurice:  Qt Creator 2.2 review
 +
** Fathi:  sysroot "sliming" scheduled.  Fathi sent an email status.
 +
** Edmondas: QEMU use for sysroot
Covered in past weeks  (Resolutions here:  http://piratepad.net/qqICWdiYLl  )
Covered in past weeks  (Resolutions here:  http://piratepad.net/qqICWdiYLl  )
Line 62: Line 68:
=== Releasing (Fathi) ===
=== Releasing (Fathi) ===
 +
* feature freeze - bug fix only
 +
** exceptions: Toolchains and Qt simulator
* hardfp toolchain into MeeGo Trunk
* hardfp toolchain into MeeGo Trunk
** SDK toolchain to update/promote
** SDK toolchain to update/promote
Line 67: Line 75:
** AP: update madde configuration for ARM toolchain (Fathi)
** AP: update madde configuration for ARM toolchain (Fathi)
* Full toolchain upgrade to 1.2 is on the way for all architectures IA32/ARM softfp and hardfp
* Full toolchain upgrade to 1.2 is on the way for all architectures IA32/ARM softfp and hardfp
-
** Pending windows toolchain integrated - Windows SDK is using 1.1 toolchains
+
** Pending windows toolchain integrated - Windows SDK is using 1.1 toolchains - Use 1.2 now (Max)
* AP: Qt Simulator to review and promote (Fathi)
* AP: Qt Simulator to review and promote (Fathi)
Line 73: Line 81:
=== Windows port (Max) ===
=== Windows port (Max) ===
-
* Still using 1.1 toolchains
+
* Preview 6 has been released
-
* AP: Upgrade to 1.2 toolchains Wenchao and Max on that. - 1.2 toolchain will be released with Preview 6 next Monday
+
** Using 1.2 toolchains and Qt Creator 2.1
-
** AP: ARM hardfp toolchain should be provided by Al
+
** See bugs 15003, 15004 and 14025
-
* AP: Update to latest Qt/Qt Creator - Qt Creator 2.1 will be released with Preview 6 next Monday
+
* AP: ARM hardfp toolchain should be provided by Al
* AP: Al to create a wiki page about the windows build server
* AP: Al to create a wiki page about the windows build server
Line 87: Line 95:
=== Toolchains (JuhaK) ===
=== Toolchains (JuhaK) ===
-
* Toolchain meetings biweekly (http://wiki.meego.com/SDK/Toolchains/Meetings#MeeGo_Toolchain_Project_Meetings)
+
* Juha on holidays
-
* AP: set up a wiki page in meego.com for following the performance/regression testing of toolchain
+
-
** This AP is pending because I haven't had time to do it. Target: next week
+
-
* glibc 2.12 or newer cannot be built with arm and this needs to be solved - I'm testing a patch right now, but building gcc for i586 seems to have failed this time. I hope to get a solution this week.
+
Line 105: Line 110:
* SDK feature status and its impacts on documentation (e.g. devices supported by MeeGo 1.2 SDK)
* SDK feature status and its impacts on documentation (e.g. devices supported by MeeGo 1.2 SDK)
** Any news on this?
** Any news on this?
 +
=== QA (Juha) ===
=== QA (Juha) ===

Latest revision as of 16:25, 30 March 2011

Contents

MeeGo SDK Weekly Meeting 20110330

This document contains agenda and minutes (added after the meeting) of SDK weekly telco meeting on 20110330 14:00 GMT.

Conventions of this document

  • AP: = Action point agreed on this meeting
  • yyyymmdd AP: = Action point agreed on previous meeting
  • yyyymmdd AP yyymmdd: = Action point agreed on previous meeting with a deadline
  • yyyymmdd AP DONE: = Action point done
  • yyyymmdd AP CANCELLED: = Action point cancelled
  • AGREE: = Item that has been agreed by the team
  • POSTPONED: = Agenda item postponed from last meeting
  • OLD: = Info from previous meeting (delete during the meeting)

Attendees

  • Veli Kaksonen, Juha Peisanen, Ville Lavonius, Taru Laine, Max Yu, Azadeh Karimian,Viorel Mirea, Bob Spencer, Ionut Gavaz, Fathi Boudra


Agenda

SDK Program (Veli)

  • Nokia changes...


Features (Ville)

Architecture (Bob)

(Meetings held weekly, as needed)

Topics for future meetings:

  • March 30th Meeting
    • Maurice: Qt Creator 2.2 review
    • Fathi: sysroot "sliming" scheduled. Fathi sent an email status.
    • Edmondas: QEMU use for sysroot

Covered in past weeks (Resolutions here: http://piratepad.net/qqICWdiYLl )


Releasing (Fathi)

  • feature freeze - bug fix only
    • exceptions: Toolchains and Qt simulator
  • hardfp toolchain into MeeGo Trunk
    • SDK toolchain to update/promote
    • AP: ks files to update - new images (Fathi)
    • AP: update madde configuration for ARM toolchain (Fathi)
  • Full toolchain upgrade to 1.2 is on the way for all architectures IA32/ARM softfp and hardfp
    • Pending windows toolchain integrated - Windows SDK is using 1.1 toolchains - Use 1.2 now (Max)
  • AP: Qt Simulator to review and promote (Fathi)


Windows port (Max)

  • Preview 6 has been released
    • Using 1.2 toolchains and Qt Creator 2.1
    • See bugs 15003, 15004 and 14025
  • AP: ARM hardfp toolchain should be provided by Al
  • AP: Al to create a wiki page about the windows build server


Mac OS X port (David)

  • David was not present


Toolchains (JuhaK)

  • Juha on holidays


Documentation (Taru)

  • Taru Laine is the doc team lead.
  • Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110331#Agenda
  • Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
    • Bob Spencer is clarifying the resources available for tasks that do not have owners at the moment.
  • Open questions regarding DMC publishing site (will be discussed at the doc team meeting of week 13):
    • What type of documentation should be published through DMC and updated according to release lifecycle?
    • What type of documentation should be kept in Wiki for continuous updates?
    • Who will take up the main role of developing the site and coordinating the process of content creation/transfer on DMC site?
  • SDK feature status and its impacts on documentation (e.g. devices supported by MeeGo 1.2 SDK)
    • Any news on this?


QA (Juha)

  • Mobility API quality
    • Accounts -50p/4f
    • QFeedBack -14p/6f
    • Multimedia -294p/5f
    • Gallery -130p/0f
    • Location -191p/20f
    • Message -187p/62f
    • publish&subscribe -23p/9f
    • Contacts -369p/2f
    • Versit&organizer -111p/2f
    • signon -85p/14f
    • QMsystem -143p/21f
    • qsparql -141p/5f
    • systeminfo -83p/6f
    • resourcepolicy -96p/0f
    • service framework -87p/3f
    • sensors -(compilation problem)
  • Basic Feature Testing(build 1.1.90.8.20110322.2)
  • Total Bug Count(368)
    • Critical - New:5 ,NeedInfo:1 ,Assigned:4 ,Waiting for upstream:0 ,Reopened:1 , Resolved:11 ,Released:0 ,Verified:19 ,Closed:0
    • Major - New:10 ,NeedInfo:1 ,Assigned:3 ,Waiting for upstream:0 ,Reopened:1 , Resolved:11 ,Released:0 ,Verified:30 ,Closed:1
    • Normal - New:101 ,NeedInfo:3 ,Assigned:29 ,Waiting for upstream:1 ,Reopened:6 , Resolved:49 ,Released:16 ,Verified:44 ,Closed:4
    • Trivial - New:3 ,NeedInfo:0 ,Assigned:0 ,Waiting for upstream:0 ,Reopened:0 , Resolved:1 ,Released:1 ,Verified:3 ,Closed:0
    • Enhancement - New:5 ,NeedInfo:0 ,Assigned:0 ,Waiting for upstream:0 ,Reopened:0 , Resolved:1 ,Released:1 ,Verified:3 ,Closed:0
  • Test transition is still in progress.
  • Review test cases on tl (BMC#12536)
  • Formalize bug handling workflow
Personal tools