Meego Wiki
Views

SDK/Meetings/20110406 Weekly

From MeeGo wiki
(Difference between revisions)
Jump to: navigation, search
(QA (Juha))
(QA (Juha))
Line 120: Line 120:
** Accepted :
** Accepted :
*** 76 for 1.2 (total 107)
*** 76 for 1.2 (total 107)
-
*** test case exists 12 for 1.2
+
*** test case exists 13 for 1.2
* Testing  
* Testing  
** Testing done last week for [[http://repo.meego.com/MeeGo/builds/trunk/1.1.99.0.20110329.5/images/meego-core-armv7l-madde-sysroot/ meego-core-armv7l-madde-sysroot-1.1.99.0.20110329.5]] on Ubuntu 10.10 32bit and Fedora13 32bit.
** Testing done last week for [[http://repo.meego.com/MeeGo/builds/trunk/1.1.99.0.20110329.5/images/meego-core-armv7l-madde-sysroot/ meego-core-armv7l-madde-sysroot-1.1.99.0.20110329.5]] on Ubuntu 10.10 32bit and Fedora13 32bit.

Revision as of 11:38, 6 April 2011

Contents

MeeGo SDK Weekly Meeting 20110406

This document contains status update of 20110406.

Conventions of this document

  • AP: = Action point agreed on this meeting
  • yyyymmdd AP: = Action point agreed on previous meeting
  • yyyymmdd AP yyymmdd: = Action point agreed on previous meeting with a deadline
  • yyyymmdd AP DONE: = Action point done
  • yyyymmdd AP CANCELLED: = Action point cancelled
  • AGREE: = Item that has been agreed by the team
  • POSTPONED: = Agenda item postponed from last meeting
  • OLD: = Info from previous meeting (delete during the meeting)


Status

SDK Program (Veli)

  • Nokia changes...


Features (Ville)

Architecture (Bob)

(Meetings held weekly, as needed)

Topics for future meetings:

  • March 30th Meeting
    • Maurice: Qt Creator 2.2 review
    • Fathi: sysroot "sliming" scheduled. Fathi sent an email status.
    • Edmondas: QEMU use for sysroot

Covered in past weeks (Resolutions here: http://piratepad.net/qqICWdiYLl )


Releasing (Fathi)

  • feature freeze - bug fix only
    • exceptions: Toolchains and Qt simulator
  • hardfp toolchain into MeeGo Trunk
    • SDK toolchain to update/promote
    • AP: ks files to update - new images (Fathi)
    • AP: update madde configuration for ARM toolchain (Fathi)
  • Full toolchain upgrade to 1.2 is on the way for all architectures IA32/ARM softfp and hardfp
    • Pending windows toolchain integrated - Windows SDK is using 1.1 toolchains - Use 1.2 now (Max)
  • AP: Qt Simulator to review and promote (Fathi)


Windows port (Max)

  • Preview 6 has been released
    • Using 1.2 toolchains and Qt Creator 2.1
    • See bugs 15003, 15004 and 14025
  • AP: ARM hardfp toolchain should be provided by Al
  • AP: Al to create a wiki page about the windows build server


Mac OS X port (David)

  • David was not present


Toolchains (JuhaK)

  • Juha on holidays


Documentation (Taru)

  • Taru Laine is the doc team lead.
  • Weekly documentation telco meetings were restarted on March 3. This week's agenda is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110331#Agenda
  • Documentation backlog for MeeGo 1.2 SDK can be found here: http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2
    • Bob Spencer is clarifying the resources available for tasks that do not have owners at the moment.
  • Open questions regarding DMC publishing site (will be discussed at the doc team meeting of week 13):
    • What type of documentation should be published through DMC and updated according to release lifecycle?
    • What type of documentation should be kept in Wiki for continuous updates?
    • Who will take up the main role of developing the site and coordinating the process of content creation/transfer on DMC site?
  • SDK feature status and its impacts on documentation (e.g. devices supported by MeeGo 1.2 SDK)
    • Any news on this?


QA (Juha)


  • Basic Feature Testing(build 1.1.90.8.20110322.2)
  • Total Bug Count(368)
    • Critical - New:5 ,NeedInfo:1 ,Assigned:4 ,Waiting for upstream:0 ,Reopened:1 , Resolved:11 ,Released:0 ,Verified:19 ,Closed:0
    • Major - New:10 ,NeedInfo:1 ,Assigned:3 ,Waiting for upstream:0 ,Reopened:1 , Resolved:11 ,Released:0 ,Verified:30 ,Closed:1
    • Normal - New:101 ,NeedInfo:3 ,Assigned:29 ,Waiting for upstream:1 ,Reopened:6 , Resolved:49 ,Released:16 ,Verified:44 ,Closed:4
    • Trivial - New:3 ,NeedInfo:0 ,Assigned:0 ,Waiting for upstream:0 ,Reopened:0 , Resolved:1 ,Released:1 ,Verified:3 ,Closed:0
    • Enhancement - New:5 ,NeedInfo:0 ,Assigned:0 ,Waiting for upstream:0 ,Reopened:0 , Resolved:1 ,Released:1 ,Verified:3 ,Closed:0
  • Test transition is still in progress.
  • Review test cases on tl (BMC#12536)
  • Formalize bug handling workflow
Personal tools