(→Documentation (Taru)) |
Ionutgavaz (Talk | contribs) (→QA (Juha)) |
||
| (4 intermediate revisions not shown) | |||
| Line 77: | Line 77: | ||
=== Windows port (Max) === | === Windows port (Max) === | ||
| - | * Preview | + | * Preview 7 has been released |
| - | + | ||
| - | + | ||
* AP: ARM hardfp toolchain should be provided by Al | * AP: ARM hardfp toolchain should be provided by Al | ||
* AP: Al to create a wiki page about the windows build server | * AP: Al to create a wiki page about the windows build server | ||
| - | |||
=== Mac OS X port (David) === | === Mac OS X port (David) === | ||
| Line 91: | Line 88: | ||
=== Toolchains (JuhaK) === | === Toolchains (JuhaK) === | ||
| - | * | + | * Proposing to properly configure the sdk toolchain to use cloog library, which it currently doesn't. Using cloog will enable the graphite loop optimizer in gcc. |
| - | + | * Proposing updates to the MeeGo 1.3 devel:toolchain build dependency packages (mpfr, gmp, cloog) and to configure the arm toolchain to use cloog too. This has been disabled because of some failures a long time ago. | |
| + | * arm glibc (>= 2.12) build problems solved last week | ||
=== Documentation (Taru) === | === Documentation (Taru) === | ||
* Taru Laine will be on holiday from 15 to 25 April. | * Taru Laine will be on holiday from 15 to 25 April. | ||
| - | * The agenda for this week's documentation status meeting is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/ | + | * The agenda for this week's documentation status meeting is here: http://wiki.meego.com/SDK/Documentation/MeetingMinutes/20110407#Agenda |
** This week the aim of the meeting is to go through the status of each content area in the http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2 and see if there are any blocks or open issues that prevent progress on a specific task. | ** This week the aim of the meeting is to go through the status of each content area in the http://wiki.meego.com/Documentation_Backlog_for_MeeGo_1.2 and see if there are any blocks or open issues that prevent progress on a specific task. | ||
* Work on Linux setup instructions will start next week. Fathi Boudra has an action point of assigning a member of his team to create draft instructions based on MeeGo 1.1 SDK documentation. After that, Taru will go through the instructions during week 17. | * Work on Linux setup instructions will start next week. Fathi Boudra has an action point of assigning a member of his team to create draft instructions based on MeeGo 1.1 SDK documentation. After that, Taru will go through the instructions during week 17. | ||
| Line 127: | Line 125: | ||
*** Valid bugs on Fedora : #12561 uninstallation, #12820 install libattica, #12821 plugin errors on qtcreator start | *** Valid bugs on Fedora : #12561 uninstallation, #12820 install libattica, #12821 plugin errors on qtcreator start | ||
** Testing not started for http://repo.meego.com/MeeGo/builds/trunk/1.1.99.1.20110405.3/ because no tar of sysroot available. | ** Testing not started for http://repo.meego.com/MeeGo/builds/trunk/1.1.99.1.20110405.3/ because no tar of sysroot available. | ||
| - | + | ** Testlink (tl.meego.com) is not available, but it's been informed to Intel. | |
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
* Test transition is still in progress. | * Test transition is still in progress. | ||
* Review test cases on tl (BMC#12536) | * Review test cases on tl (BMC#12536) | ||
* Formalize bug handling workflow | * Formalize bug handling workflow | ||
Contents |
This document contains status update of 20110406.
(Meetings held weekly, as needed)
Topics for future meetings:
Covered in past weeks (Resolutions here: http://piratepad.net/qqICWdiYLl )